FERC has issued approval for Gulf South Pipeline Co., LP for the Index 99 Expansion Project. The project would include the construction of the following facilities: installation of approximately 22 miles of new 30-inch-diameter pipeline (Index 99L), including cathodic protection along the proposed pipeline, beginning in San Augustine County, Texas and terminating in Sabine County, Texas, at Gulf South’s existing Magasco Compressor Station near Pineland, Texas; installation of a pig receiver at the intersection of the new Index 99L pipeline and Gulf South’s existing Index 99 System, in San Augustine County, Texas; installation of a pig launcher at the intersection of the new Index 99L pipeline and Gulf South’s existing Index 99 System and Index 129 Legacy System (within Gulf South’s existing Magasco Compressor Station), in Sabine County, Texas; installation of one new mainline valve assembly along the new Index 99L pipeline, in San Augustine County, Texas; installation of approximately 250 feet of new 24-inch station piping and a 24-inch-pressure control valve at the existing Hall Summit Compressor Station in Bienville Parish, Louisiana. Additionally, Gulf South proposes to use 3 contractor/pipe yards (all in San Augustine County, Texas), as well as 9 temporary and 18 permanent access roads during construction of the Index 99 Expansion Project. Construction is tentatively planned for spring 2020 with the project slated for in-service in October 2020.